PROJECT GATE MODEL
Required progression
01
Define
Confirm the operational need, site conditions, measurable outputs and responsibilities.
02
Design
Prepare scope, method, programme, controls, equipment and specialist requirements.
03
Mobilise
Deploy approved people, verified equipment and the required HSE documentation.
04
Execute
Perform, inspect, test and report against the approved scope and acceptance criteria.
05
Handover
Deliver records, results, as-built evidence, training and warranty obligations.