PROJECT GATE MODEL

Required progression

01

Define

Confirm the operational need, site conditions, measurable outputs and responsibilities.

02

Design

Prepare scope, method, programme, controls, equipment and specialist requirements.

03

Mobilise

Deploy approved people, verified equipment and the required HSE documentation.

04

Execute

Perform, inspect, test and report against the approved scope and acceptance criteria.

05

Handover

Deliver records, results, as-built evidence, training and warranty obligations.